The Bathroom Page:
 
 

The main level surround is in! Cabinetry is ready to be installed The upstairs whirlpool and surround.
 
 

Durock is installed the bathrooms     The master bath 
durock, LOTS of     Cindy brings in the linoleum for
and laundry!  Thanks Scott!              
work!                                            
the 2 baths and laundry room.
                                                                                                         
Our bath will be tiled.
 

The mess waiting for some attention.
 
 

The main level bath floor is in!        
The main level tub trimmed out!      Guest bath almost 
done!  Yes,
                                                                                                          
that's a whirlpool in there!
 

Guest bath flooring done!                
The laundry room floor is in!
Just need the vent cover.