Trim page:
Interior doors being installed!
Dad showed me how they install doors. We got pretty proficient after
the first few.
Solid Oak pre-hung doors are VERY heavy!
Downstairs hallway doors. Me, with shims in hand...
The arch for the dining room
is ready to go in.
Front entryway bypass
Upstairs you can see 5
Double closet doors in guest
doors.
doors from one point.
room.
Upstairs doors stained.
Master Bed/Bath stained.
A little dusty on the floor.
Cindy sure had a LOT of trim to stain, sand and put on 2 coats of polyurethane!
The basement was absolutely FILLED with trim in the process of
Edge detail of the oak trim.
being finished.
Jeff Loitz is completing the tile installation and then trim for the lower fireplace.
The sample brick for the upper The
lower fireplace is finished!
fireplace.
The dining room trim installed.
Dining room to kitchen trim.
The pantry doors finally arrived
and installed. Ready to stain!